Inspection checklist for EXCAVATION & P.C.C. | Civil Engineering

Checklist EXCAVATION & P.C.C.

  • Final plinth levels of all buildings.
  • Strata as per consultant’s specifications.
  • The size of the holes is further than the size of P.C.C., & depth as asked.
  • Shuttering provided, if required.
  • Uniformity & thickness of soling.
  • Compaction of concrete.
  • The thickness of P.C.C. is specified.
  • Curing for 7 days.